7
Currently with ECM Module if we manage a date of validity in the Version (From Date/To Date) all the dates of Routes and BOMs (Engineering controlled) of the same Version are taken from the date of the item version. We cannot change the “from date” or “to date” of the route/BOM versions.
We would be able to modify the dates of the Route/Bom Version if these are within the release time Version window, to manage alternatives BOM or Route of the same item version.
Example:
Engineering Item with Version = V1
Version From date = 01/01/2023
Version To date = 12/31/2023
ROUTE ID (or BOM) FROM DATE TO DATE ACTIVE
00001 01/01/2023 06/30/2023 Yes
00002 07/01/2023 12/31/2023 Yes
STATUS DETAILS
Needs Votes
Beatriz Nebot Gracia (administrator) on 7/4/2023 11:22:34 AM
Thanks for your input! If it gets voted, we will consider adding it to our long term roadmap.
Sincerely,
Beatriz Nebot Gracia
Product Manager, Microsoft