11
Create the ability for mass creation of timesheet entries (for administration purposes) or allow project journals (time) to be included into timesheet data. If multiple calendar types are defined then D365 does not support worker/resource changes. Currently timesheets and missing timesheet routines work within calendar type, so we need a process to ab able to maintain records and gaps in data.

Option A - Project Management - Create a periodic task to generate timesheets (based on similar process to missing timesheet report), then create a data entity to allow extraction of timesheet/timesheet lines and bulk update. The ability to create timesheets should be parameter driven so you can define the worker/resource, date range and calendar type. The subsequent data entity to support updating timesheet lines should support multiple timesheets per worker/resource.

Option B - Project Management - On creating timesheet journals include a column that allows the user to define if a timesheet record. These journals should then be included with timesheet records when reporting on timesheet data (and Missing Timesheets). Project journals are not bound by the same controls over worker periods and as such allow for bulk updates. Limitation of this option is the support for intercompany transactions and automated project recharge process.
STATUS DETAILS
Needs Votes