Ideas

Add sequence as a sorting criteria for dispatching

on 2/28/2018 7:17:52 PM

Add sequence as a sorting criteria for dispatching

Business case: Customer re plan batch orders on daily basis to align with late changes of demand or equipment disturbance.

Issue with current support: Sequence concept is only supported on planned order level

Id...

Read more...

Read more...

Category: Service Management (6)

STATUS DETAILS
New

Allow RAF even if picking list fails (backflush)

on 2/28/2018 7:16:13 PM

Allow RAF even if picking list fails (backflush)

Business case: Customer don't allow production output to stop due to issues with material consumption of back flushed material

Issue with current support: Report as finished fails if picking list journal (backflu...

Read more...

Read more...

Category: Production Control (74)

STATUS DETAILS
Under Review

Overproduction with raw material used frequently on the production line

on 2/27/2018 10:40:00 PM

Overproduction with raw material used frequently on the production line

Business scenario:

Customer don't know the output from production orders upfront (it varies), ie they calculate with 50 kg of finished goods (production order quantity), but in the end...

Read more...

Read more...

Category: Production Control (74)

STATUS DETAILS
Under Review

Be able to reverse LP from co-products.

on 2/27/2018 3:49:27 PM

In the process industry we are working a lot with co-products.

Even in the scenario of using a planning item – everything that you RAF is by default co-products – and here we would from time to time need to revert them.

In previous releases it became possible t...

Read more...

Read more...

Category: Production Control (74)

STATUS DETAILS
Under Review

Raw material retrieval to line

on 2/9/2018 6:16:21 PM

In the process industry we often see, that the raw-matarial consumption various due to yield and mixed dosing between raw material line A and B. It means that during production, the shopfloor worker, realized that he/she needs more raw-material of item A, to fulfill the production quantity.

Read more...

Read more...

Category: Production Control (74)

STATUS DETAILS
Under Review

Return from Line / unpick

on 2/5/2018 7:51:17 PM

In the proces industry we are often using the flushing principle "Avaliable on location". We also use staging concept and pick complete LP´s to the prod in location. However due to yield and over and under production we are not always consuming according to work and we want to return fro...

Read more...

Read more...

Category: Production Control (74)

STATUS DETAILS
Planned