Re estimate after picking list is posted deletes all existing Cost group lines on the Estimated and Realised (quantity and cost) at lower level (level 2) and only adds back the Estimated quantity and cost at the lower level. Resulting in the realised cost and quantity only showing on the higher level (1). The realised cost and quantity should also be added back when re estimating the production order.