Re etimating Production orders deletes all existing Cost group lines at a lower level
Re estimate after picking list is posted deletes all existing Cost group lines on the Estimated and Realised (quantity and cost) at lower level (level 2) and only adds back the Estimated quantity and cost at the lower level. Resulting in the realise...
STATUS DETAILS
Needs Votes