Finish Production Order Worksheet
We are developing a Finish Produciton Order Worksheet to more effectively change from released to finished.
The page is loaded with orders where qty remaining less than or equal to zero or the final operation is set to finished.
They also have the ability to populate the sheet with...
Changing status of production order
You should be able to change the status of a production order from firm planned to planned.
Also from Released to planned or firm planned (when there has been no posting on the PO - outsourcing purchase orders etcetera).
Output journal select range of released orders.
It is necessary to be able to select a range of manufacturing orders in the output journal, since going one by one per line is not operative since there are customers who have many orders to register.
than...
Exchange Production BOM Item - Allow to remove item/BOM instead of exchanging
Hi,
Please add a new option to the "Exchange Production BOM Item" report to delete the selected item/BOM from Production BOM. Currently, you must specify both Source and New Item/BOM; the suggestion is to allow empty "New" + add option "Delete".
Real Time Planning
The Planning Worksheet parameters should follow Real World ideals. It currently suggests that we go back in time (Maybe with Doc Brown), and place orders in the past so that they arrive in the time needed. At a MINIMUM, we should be able to change a Global parameter that blocks the system fr...
Remove item from BOM using Exchange Production BOM Item
Page "Exchange Production BOM Item" allows replacing of one item in Production BOM with another item. Sometimes, our customers need to remove a specific item from all BOMs. I think the easiest way would be to use this functionality as it's just "replace by nothing".
PIXAR ANIMATION STUDIOS
PIXAR ANIMATION STUDIOS/HD 4Dx JBL WiMAX ADOBE'S/BY MICHAEL LEE JOHNSON 11/DISNEY/PIXAR ANIMATION STUDIOS/
Time in (ms) in all table (Capacity Need, Capacity Ledger Entries)
Please uniformize time (ms) in all tables
it will be easier to analyze Capacity, Allocated Time, Remaining Time.
These fields not exist and should be added :
Table : 5410 [Prod. Order Capacity Need].[Allocated Time (ms)]
Table 5832 [Capacity LEdger...
Calc. Output in Output Journal
Replicate the funcationality of the Calc. Consumption Process in the output journal to build out the system expected outputs
Consumption Lot Item Tracing per Individual Production Output Booking
Implement Item Tracing, on a production output booking, whereby raw materials consumed can be directly related to EACK individual output booking. Thus meeting aerospace ISO requirements.