This level and lower level costs - Full Material, Labor/Machine and Overhead Accounting
This is a big ask, but many competitors to D365 already have this capability, sometimes from as long as 50 years ago.
In cost roll-up (Calculation) rather than treating ALL lower-level costs as Material, take their entire breakout and store it as several lower-level costs. The...
Improve Overview Costing Accuracy After Changing Indirect Cost Rate for Production Orders
Title:
Improve Overview Costing Accuracy After Changing Indirect Cost Rate for Production Orders
Description:
an issue in Dynamics 365 Finance and Operations where the overview costing becomes incorrect after changing the indirect cost rate f...
Substitution and Quantity variance on Production order should not be calculated when using Resource groups
Unexpected Quantity and Substitution variance is generated on the Production orders when using Resource groups on the route.
The Resource requirement for the route operation is set for a resource group. The standard cost is calculated considering the resource group as the resource (Item/...
Proposal to Change Validation During Entity Import for "Costing Sheet Node Calculation Factors V2" to Reduce Manual Work
A critical issue when importing new costing sheet nodes using the "Costing sheet nodes and absorption basis" entity.
The problem arises when parts of the costing sheet fail during import, whereas importing the full costing sheet results in the deletion of all existing costing...
Standard cost activation posts adjustments that split transactions and results in alteration of the created date and time.
When activating a new standard cost for items in d365, the system posts adjustments that split the inventory transactions into separate line with varying quantities for the corresponding items and results in created date and time alteration.
As a consequence, the system modifi...
The indirect cost now displays in the cost calculation for the production order it should not be there.
The customer has closed a production order, prior to creating an indirect cost in the costing sheet.
This indirect cost now displays in the cost calculation for the production order it should not be there.