1

Suggested by Greetje Geens New 

For Belgian local requirement, the F01DGS report (BLWI) would enable the creation of multiple lines in case of credit notes (from customers or vendors). In case of a credit note, the original line with correct central bank code must be the base to create another line with an adapted central bank code (original central bank code + CN) with exactly the same information.

When creating the output report (XML file) this will fit the Belgian local requirement for the F01DGS report.