User Profile

Extend 30 Character Limitation on Previous and next Operation field in Routings to 60 characters


For one operation I have three parallel operations. One for Machine, one for Operator and another for labour. Machine, operator and general labour are defined as work centers If I have four parallel operations , it would require 4 X 3 = 12 operations numbers to be put in the previous and n...

Read more...
4 Comments

Read more...
4 Comments

Category: Manufacturing (195)

STATUS DETAILS
Needs Votes

Add Capacity Unit of Measure codes to routing line in production order


When we want to change the machine center /work center of a production routing line, there is no unit of measure field available for adding. The system is assuming it to be the same as work center/machine center. This is messing up the schedule. My work center and machine center have unit of me...

Read more...
0 Comments

Read more...
0 Comments

Category: Manufacturing (195)

STATUS DETAILS
Needs Votes

Order Multiple field should be in Purchasing Unit of Measure or give option to choose between base and Purchase UOM unit of measure


When a purchase order created from planning worksheet. If the Purchase unit of measure is different than the base unit of measure, it seems it is applying it to base unit of measure and not purchasing unit of measure. for example if the base UOM is Meter and Purchase UOM is PC where one PC = 6 ...

Read more...
0 Comments

Read more...
0 Comments

Category: Inventory (363)

STATUS DETAILS
New