FR Localization : Simulation Source Code no longer exists
In the previous NAV 2018, FR localization gave the possibility to have Simulation Source Code. It was very usefull in order to create forecast in the general ledger account. These simulated entries could be posted into real ledger entries. It would be great to re-introduce this functionality in ...
Do not assign a location code for non-stock item in a production order
I use a Non-stock item in a production BOM. When I create a production order using this production BOM, the system automatically assign a location code for each component thanks to the field "Components at Location" from the manufacturing Setup (or the SKU if existing). The problem is that this l...
Having lot number with several expiration date
In Business Central, when an item is managed with a lot number and expiration date, it is not possible to have, for the same lot number, different expiration date. In industrial context, it is a real need. Several examples : - In food manufacturing, when a single production order lasts more than ...
Create production order from a sale order
When a production order is generated from a sale order (from the "Planning" button"), all lines from this sale order are taken into account to create production orders. In many cases, the user just want to create a production order for a specific line and a specific quantity. I would be very hel...
Give an access to "Project Planning Line" page from the search engine
When I select the role « Project Manager », I have access in the role center to the page "Project Planning Line" (page 1003).
But this page is not available in the search engine. So, If I do not have this role, I cannot find this page.
Could you add this page ...