15
Currently the automatic cross docking and planned cross docking functionality does not support usage of the load planning workbench.
This means the functionality does not support common scenarios for load planning including where;
1. There are multiple sales orders per load
2. There are multiple loads per sales order
The desired functionality;
Automatic cross docking - If the sales order line is added to a load (either before or after the production order is created from the sales order line) then the production report as finished should cross dock to the allocated load. Put away work should be automatically split if the production order is cross docked to multiple loads.
Planned cross docking - Cross docking should be supported at release load to warehouse (from the load planning workbench).
This means the functionality does not support common scenarios for load planning including where;
1. There are multiple sales orders per load
2. There are multiple loads per sales order
The desired functionality;
Automatic cross docking - If the sales order line is added to a load (either before or after the production order is created from the sales order line) then the production report as finished should cross dock to the allocated load. Put away work should be automatically split if the production order is cross docked to multiple loads.
Planned cross docking - Cross docking should be supported at release load to warehouse (from the load planning workbench).
STATUS DETAILS
Needs Votes