6
When I enter time in a timesheet, all that's displayed is a line item from the selected Job. If I have multiple jobs with similar planning lines ("Professional Services", for example), I end up having an unintelligible timesheet which displays identical entries, or I have to manually edit every planning line when I add it to the timesheet (that's not good). It would be great if on mouse-over the entire planning line path was shown, or perhaps if it was displayed directly on the timesheet, perhaps in smaller font alongside with the planning line title.
STATUS DETAILS
Under Review