6

When I enter time in a timesheet, all that's displayed is a line item from the selected Job. If I have multiple jobs with similar planning lines ("Professional Services", for example), I end up having an unintelligible timesheet which displays identical entries, or I have to manually edit every planning line when I add it to the timesheet (that's not good). It would be great if on mouse-over the entire planning line path was shown, or perhaps if it was displayed directly on the timesheet, perhaps in smaller font alongside with the planning line title. 

Category: General
STATUS DETAILS
Under Review