0
Category:
STATUS DETAILS

Comments

As called out on previous comments, requiring the Inventory value report data clean-up job to be run manually rather than allowing it to be set up on a batch is an issue as we are generating a variety of inventory storage reports. This would be very beneficial.

Category:

I agree. Please make this feature available to Wave 2 release as the current lookup view is not very user-friendly.

Category:

Hi, This would be an essential change and it would be really beneficial to have product search by attributes in practice on all product search pages. On my business area customers are having thousands of products and attribute usage is key for proper product management for them. With the same effort I would extend this idea a bit. While selecting attribute on search, user could mark attribute like "Show value on list" after which system would generate new column for each selected atttribute and show value of it. With standard functionality user can then filter / group products on the list. This is how attributes are used to group products together on reporting as well.

Category:

This is a must for international business relationship. Foreign Currency can be chosen for the customer account and for the product in the service contract but then there is a wrong FX-calculation when the invoice is generated. It looks like a system bug (that needs to be fixed), and not a missing function that needs votes!

Category:

I think this would be an extremely useful feature. Why block the main thread when waiting for a response from a system that might be processing my request for a very long time? I feel the lack of features like this one makes BC way less efficient for serious integration scenarios.

Category:

Edit: maybe it's not clear but i don't mean TAB or leading spaces present n the word layout but the TAB and leading spaces present in a text field (inside the dataset).Would be nice to have a new option in AL to say "do not delete the TAB characters and leasding spaces"

Category:

The system should not allow a project stage of Finished if pending/chargeable transactions exist on the project.

Category:

This is still a pain point and would expect this validation would've been standard functionality of the project stages. If open Chargeable transactions exists, the system should be smart enough to prevent closure of the project.

Category:

Ye agree excel or csv data format should be same. Ideally for big data export we should option to have export csv.and it's format should aligned with headers

Category:

Thank you :)

Category:

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 500