9
When using the move function to assign a machine center from the work center task list or when in the production order routing you change the type to Machine Center from work center and choose a machine center, the fields on the Machine Center Scheduling tab override the routing times always via the stock code.
We need the option to not do this as in many cases this is not desirable and not wanted.

For example if the setup time is 0 or blank then the routing setup time could carry forward. Or add a new Boolean field "Use Routing Times" which when it is true it would not change the times on the routing, just change the work center to the chosen machine center.

We can figure out how to address this via an extension but it is code that should not be needed with some flexibility in the stock code (simple if statement could fix)