29

Let's say for a shipment, there are 2 items.

Now Anchoring is working if the works #1 (for item A) and #2 (for item B) already exist.


In real life, we often have business cases where work #1 exists. Work #1 is processed (ex : put on location LOC-001 and override location to put it on LOC-002).


Then work #2 is generated afterwards.


Current situation : the put work of work #2 does not take into consideration that the work #1 has been put on LOC-002, because work #2 was not opened when work #1 has been processed. D365 can suggest LOC-001 for example.


Requirement : when work #2 is generated, the put location for work #2 should be the same location as the one where work #1 has been actually put (ex: LOC-002)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future. 

 

Sincerely, 

Per Lynnerup 

PM, Microsoft