When utilizing multi-day scheduling and manually creating a resource requirement it would be ideal to have the time from / time to and even the days from / days to taken into consideration. This would allow for the resource requirement details to be created based on pre-defined information.

Scenario we are dealing with is repairs on a hospital and the work needs to occur between 11 PM and 7 AM. A lot of times it is more than 1 day worth of work and we are having to manually schedule. Therefore, being able to pre-define at least when the work should occur would allow for better usability.
STATUS DETAILS
Under Review