10
When we are testing batch functions, batch can take a longer time to run, so we need to add some wait time, before we move on to the next steps. Currently there are two options: adding wait time between all steps (this slows down the test run tremendously) or to add some extra steps during recording (like opening/closing forms), but none of these are efficient. During recording with the right click / Task recorder button there should be a new option for this. This number should also be editable later in the excel.
STATUS DETAILS
Completed
Comments
Is it really implemented? I only see a parameter on test level not on test step level. Or I'm I missing something?
Category: Regression Suite Automation Tool (RSAT)
Administrator on 12/4/2020 10:20:41 PM
This functionality is available as part of RSAT version 2.1. It is scheduled to be released to preview in December 2020 and to be made generally available in January of 2020.