Actually the project quotation lines are sorted by activity number. If the WBS are updated with new lines in the WBS - not at the end of the WBS - the project quotation is still sorted by activity number. So the quotation lines are not anymore structured. Idea: At a editable position number in the WBS details. By transfer the WBS lines into the quotation the quotation lines will be structured by PSP number like: 1 1.1 1.1.01 1.1.02 2 2.1 2.1.01 2.102 etc.