1
Right now, BC variable allocation dimensions must be the same for the breakdown and destination for each line in the allocation. I have a client that wants to break the link in order to keep the breakdown location as the physical location of where the FTE, beds, sq footage, hours worked etc are. However they have 500+ physical locations that they want to use a reporting (summarized) location dimension for the destination.
They are migrating from GP which allows variable allocations to be managed by a trigger account. They are migrating to BC which makes it impossible to have different destination locations than the originating breakdown destinations.
The client is too large to try to manage this process manually.
STATUS DETAILS
New
