6

For each of the lines in the production family, allow the user to define a percentage cost allocation from the routing such that the family cannot be certified if the total is not 100.


Eg:


Production Family has a routing that includes 1 Work Center with a setup of 1 hour and run of 1 minute per

Production Family produces 3 parts, 1 of which uses 90% of the material (.9 of the main component parts), and 2 of which use only 5% of the material.

Allow the user to assign a % of the ROUTING COSTS to be allocated as recorded in Output Journal.


EG: If we make 60 of the family which produces 60 of Item 1, 60 Item 2 and 60 Item 3 then the user can decide to allocate 90% of the Output Costs to Item 1, 5% to Item 2 and 5% to Item 3.


Alternatively the user could allocate 33.4, 33.3 and 33.3.


This is controlled by the setup of the production family.

Category: Manufacturing
STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for this suggestion! Currently this is not on our roadmap. We are tracking this idea and if it gathers more votes and comments we will consider it in the future. Best regards, Business Central Team