2
So this is one of those small things that irritates me, we have several Schedule boards where each Regional and Local resource planner has his/her own view, on top of this we have 1 or 2 global views for everyone.
The way the sorting of the schedule board tabs works today forces the users to first load one of the schedule board that is for "everyone", before they can navigate to the one they have designed "specific people".
We have tried to put a high "order number" on the schedule boards that is for "everyone" so that the users lands on his/her preferred schedule board first, this does not work since D365 sorts first on type and then on order number (this was confirmed behavior from MS support).
So pleas let us sort the schedule board tabs on order number alone, then we can decide system wise what to load first for the users.
The way the sorting of the schedule board tabs works today forces the users to first load one of the schedule board that is for "everyone", before they can navigate to the one they have designed "specific people".
We have tried to put a high "order number" on the schedule boards that is for "everyone" so that the users lands on his/her preferred schedule board first, this does not work since D365 sorts first on type and then on order number (this was confirmed behavior from MS support).
So pleas let us sort the schedule board tabs on order number alone, then we can decide system wise what to load first for the users.
STATUS DETAILS
Needs Votes