1
The Business Process Modeler in LCS creates work items in DevOps. If the BPM node is deleted the DevOps record is updated to a State of 'Closed'. Even at this point, if the DevOps work item is deleted a sync error is issued.
'Closed' means something considered but canceled. BPM structure will always change so title nodes especially, need to be allowed to delete or some other State.
Perhaps updates from a BPM deleted could update to a State of CANCEL or DELETE and then deletion in DevOps would be allowed so all that junk doesn't mix with work items that really need to reflect a Closed state.
STATUS DETAILS
Needs Votes