In the process industry we are working a lot with co-products.


Even in the scenario of using a planning item – everything that you RAF is by default co-products – and here we would from time to time need to revert them.


In previous releases it became possible to RAF on co- and by products. So the following idea would be a natural step towards a complete solution a round co-products.


IDEA: enable the possibility to revert a Co-product.


 


Nb: As of now, The co-product LP is shown in the dropdown lp-list for reverting lp´s, but it is not possible to revert it.


Br. Henrik

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

Sincerely,

'Johan Hoffmann

PM, Microsoft

Comments

H

Reverse of LP should not only be the whole LP but also part of the LP. The scenario could be that 100 kg was reported as finished (e.g. default quantity) but only 90 kg is correct. Then the reverse of the LP if 10 kg should be done.
If possible, also reverse of reported LPs of by-product would be good. 

Category: Production Control