10

The input location for prodyction is either the default location on the warehouse or on the resource group. It would be great if it could be a range of locations for example all of a given Location profile/Location type. The scenario is that (in adv.wh) that multiple works are generated for one production order. when they arrive at the production floor it would provide a lot of value if it was possible to place it at a location perhaps even better use the "leader" functionality so that the first pick was placed at a location and the remianing were directed towards that location.

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Johan Hoffmann

PM, Microsoft

Comments

D

Could solve a common issue:Production input location with and without LP. Very common issue with posting picking lists when the LP is not found by MS logic.And it would solve this not so common but vert relevant scenario:Scenario with production orders where the same raw material can be two times in the ProdBOM. Staging of LPs to a production input location. One pallet at the time can be picked, the work is split to get one work per line in ProdBOM. Its staging which means that the warehouse worker might pick a pallet which will quantity wise cover both lines. The second work will then automatically be cancelled. Not the desired outcome as the pallets are placed at different physical locations on the shopfloor. We need two pallets - one per line in the ProdBOM.

Category: Production Control