-
Inherit the original operation number on the new production BOM item by using the "change BOM item" feature
The "Change BOM item" feature for item replacement in the production BOM doesn't enter the operation number correctly.
The feature allows you to indicate the old item already present in the production BOM and the new item to be replaced. The system then resets the quantity of the old item in the BOM, inserts the new item into the BOM but associates it with the first operation number of the route and not with the operation number to which the old item was associated.
The expected behavior is that the system associates the new BOM line with the same operation number with which the original replaced item was associated.
