  • Batch CTP behaviour when multilevel BOM and finite capacity/property planning are combined

    Batch CTP is confirming dates when no capacity is found on a lower level of a multilevel BOM. MRP calculation however is correctly calculating:

    • error after MRP run 'no capacity could be found'
    • Planned order: route job = 'no'.

    To make Batch CTP work in this structure the confirmed date cannot be set if on a lower level no capacity is found.

    Request: Change Batch CTP to take all MRP calculations correctly into consideration to confirm sales order lines.