-
Release to warehouse from load does not work if a wave exists
Making use of the Load planning workbench when releasing to warehouse with existing wave, does not work and the only action is a load posting event.
Expectation is that if there a wave has status created and already released load to warehouse to be processed (and not to manually process it)
-
Remain report as finished quantity show wrong amount when having error qty reported and posting negative RAF qty.
In a scenario where:
Start Remain qty = 4
RAF qty 1 > Remain qty = 4-1 = 3
Report Error qty 2 > Remain qty = 3-2= (Should be equal to 1) but the system treated it as 0 when reversal qty introduced by -1
Based on the parameter Increase remain qty with error qty, it will have the same logic if it's been turned ON or OFF and the qty remaining will be equal to 4 (when it should be 2)
When it's ON: Remain = Remain - good quantity.
When it's OFF: Remain = Remain - good quantity - error quantity.
Reversal:
When it's ON: Remain = Expected - posted - posting.
When it's OFF: Remain = Expected - posted - posting (good + error quantity).
-
Per catch weight unit on warehouse management processes
When using CW item handling policies (Per picking quantity), instead of capture weight 2 times for each LP, they capture one total weight for 2 LPs
Workarounds not possible:
a special work template created for the pallet, box and piece and the system created an individual order for each item. Unfortunately, now a large number of warehouse orders are causing us a problem in controlling the work in the warehouse and increasing the number of clicks per terminal to the warehouse worker while collecting goods and it is very impractical for each unit of measure and each piece in that unit of measure to have a separate order.
The request here is to improve the system in a way that would be logical to work. To create one order for each of the types of packaging – a box, a piece and to request a weight reading for each box or piece within that order. In this way, the work in the warehouse would be far more transparent and the work itself would be much faster.