Suggested by Estelle Lecomte – Needs Votes
Let's say for a shipment, there are 2 items.
Now Anchoring is working if the works #1 (for item A) and #2 (for item B) already exist.
In real life, we often have business cases where work #1 exists. Work #1 is processed (ex : put on location LOC-001 and override location to put it on LOC-002).
Then work #2 is generated afterwards.
Current situation : the put work of work #2 does not take into consideration that the work #1 has been put on LOC-002, because work #2 was not opened when work #1 has been processed. D365 can suggest LOC-001 for example.
Requirement : when work #2 is generated, the put location for work #2 should be the same location as the one where work #1 has been actually put (ex: LOC-002)
Status Details
Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.
Sincerely,
Per Lynnerup
PM, Microsoft
We have the same request from our customer. They cannot wait to start staging until everything has been packed.