Engineering Change Management - Copy BOM Line Effectivity Dates
BOM line effectivity dates should be copied from the Engineering company BOM to the Transactional company BOM when copy BOM functionality is used in the Eng Chg Mgmt product release policy.
Production Floor Execution - Time Visibility
Allow production floor execution configuration to include both operation run time (time the operation is expected to take) and total estimated job time (total estimated time for all jobs related to production order).
Enable physical post financial dimension validation
Production, sales, and procurement physical postings do not validate financial dimensions against the advance rule structures allowing invalid combinations in the physical postings. The end result is that at the time of the financial posting a validation error is presented (see below) and the ...
