Improved Consistency Check for Routes


Add logic to the consistency check for routes to verify that there are properties assigned to a route operation AND at least one resource requirement record for the route operation. When performing an import of route lines, 10's of thousands sometimes, it is very easy to miss a record in the dat...

Read more...
0 Comments

Read more...
0 Comments

Category: Production Control (487)

STATUS DETAILS
Needs Votes

Include BOM/formula step consumption in Planning Optimization


The use of step consumption on a BOM/formula line greatly reduces the number of BOMs/formulas to maintain. For example, if I have 10 formulary items and just one component on the formulas varies based on the number of liters produced from 1 to 10 in steps of 1, I will only need 10 formulas us...

Read more...
1 Comments

Read more...
1 Comments

Category: Planning (364)

STATUS DETAILS
Under Review