1
There should be a way to schedule a series of jobs that need to be run in a sequence with out over running each other and causing locks or other issue. For example we would have a Scheduler set to run the six jobs below with 1 schedule, the second job does not start until the first is done and so on. The run time for each job is not always consistent and overruns cause issues.


Run sales packing slip posting for a specific LE
Run Invoice posting for a specific LE
Run Invoice Posting and Printing (we do not print CC payment invoices)
Run sales packing slip posting for a different LE
Run Invoice posting for a different LE
Run Invoice Posting and Printing for different LE
Category: General
STATUS DETAILS
Declined