For Fixed Price project, we have Manual option at the Estimate calculation to determine the percentage of complete of the project and determine the percentage of complete that we want to recognize the revenue. System is closing all the incurred cost up to this point. System shall have a manual option for closing cost as well. Let's say if I want to recognize 50% of the revenue, at the same time, I would like to close 50% of the ETC instead of the real time incurred cost.

Thank you so much.