1

Plan group and Priority are two new columns that control the item substitution logic enabled by the new item substitution feature turned on for the Planning and Optimization Service.


However, these new columns are not available for engineered products released from an Engineering Change Order.


Please make these fields available so it can be defined during the ECO/NPI process of the Engineering Change Management module.


Thanks

Jameel


STATUS DETAILS
New