Comments
As an additional comment the issue is happening on a SAAS environment and partner doesnt have access to extend the server time out period and if possible to address this it will help our larger customers proceed with their daily operations and avoid developers struggling with updating their extensions for a good business continuum.
https://www.yammer.com/dynamicsaxfeedbackprograms/threads/3254021163048960Both pegged supply and purchased components for a production order should be included in the solution.Pegged supplyIf the sub production order is reported as finished on a location with policy "No work", then the raw material picking work or cross docking work should be created based on the cross docking template setup.Alternative: If the sub production order is reported as finished and the finished goods put work is created, then the put location should be the input location of the resource on the production BOM, andwhen the finished goods put away work is completed, the production BOM line should be auto-picked.
It appears that options for formatting a post on this site are fairly limited. I was trying to post an ascii table of conditions under which the failure occurs. The bottom line is printing a check fails silently in Microsoft Edge on Windows 11 if the always download PDF's option is turned on and edge is not the default pdf handler for Windows.
Very sorry for the formatting error above, It appears there's no way to edit the post on my end. Hopefully this attempt reads correctly.Observed Behavior (Check Printing Matrix):Always Download PDFs | Default PDF Handler | Check Print Behavior---------------------|--------------------------|-------------------------------Off | Edge | Works – print dialog opensOff | External (e.g., Acrobat) | Works – print dialog opensOn | Edge | Works – print dialog opensOn | External (e.g., Acrobat) | Fails silently – no dialog, no error