2
When user create a manual Production batch the formula lines are in the same order as in the Engineering formula. But when the batch item is firmed from MRP the Formula is resorted in the Production formula.

Ideally the sorting is should be same when firmed from MRP or done manually.
Category: Planning
STATUS DETAILS
Needs Votes