Enable the Direct Unit Costs / Indirect Cost and therefore Unit Cost on the Resource card to be based on table data. The Direct Unit Cost / Indirect Cost would show the latest values saved to the table.

When processing WIP with respect to timesheets or Job Journal Entries. The value in Direct unit cost etc table would be used with corresponding dates on timesheets for example to record the direct unit cost at the particular time.

Example - Resource A on the 1/10/21 Direct Costs were $20, Indirect Costs 10%, on the 20/10/21 Direct Costs changed to $30 on Indirect Costs of 20%. When processing the time sheet/ job journal on the 30/10/21 - The job journal would calculate the relevant cost for each of the periods listed above.