24

With reference to LCS issue#747033 


In the following context, the business is required to have a distribution center and a manufacturing plant at two different sites that are linked by a transfer order.

The sales order is entered at the distribution center site. On the sales order line a specific sub-bom for a configured item is applied. The selected BOM version is from the manufacturing site, while CTP is a delivery date control method used. 


When master planning (net requirements) is updated, the system creates a new planned transfer and planned production order, although the sales line has the transfer order marked properly and the transfer order ship is marked to the production order. This behavior is only visible if a sub-bom and transfer order are being used.


Having the feature implemented would considerable reduce the workload of planners, and provide a greater visibility on the BOM needed to be used as such to manufacture products.

Category: Planning
STATUS DETAILS
Needs Votes
Ideas Administrator

Thanks for your input! If it gets voted, we will consider adding it to our long term roadmap.

Sincerely, 

Beatriz Nebot Gracia

Product Manager, Microsoft

Comments

L

It should be part of MTO supply automation feature in a scenario without intercompany

"

Category: Planning

L

a much-needed solution for any MTO company that operates a distribution center that is fulfilled through a transfer order and needs to specify a specific BOM on the sales order lines.

Category: Planning