1
	Wish there is an option to easily inquiry and/or report on fixed asset production specifications based on a total period range of opeations (e.g. morning and/or night shift). (e.g. energy o power grid distributions, or maquiladora industry.
                                            STATUS DETAILS
    
 
                                        
    New
     
                                        
		