9
Besides converting Check Links logic into SQL stored procedures, it would be very useful to have a Check Links "preview" that would show what changes are GOING to be made BEFORE actually implementing them. Essentially, a Check Links report up-front with a user confirmation to go ahead, besides seeing the report at the end of the process.
Category: System
STATUS DETAILS
Declined
Ideas Administrator

Thanks for the suggestion.
With the Lifecycle of Dynamics GP at this time, this suggestion would be out of scope.
Thanks
Terry Heley