1

Suggested by Francisco Orozco New 

Featuring Guides from asset leasing, fixed assets and/or from PSA project customer services, is optimum, however featuring guides from Production design (along with BOM operation steps transfers) and BOM instructions assembly lines, maybe optimum ideal functional.