3

Master planning auto firm transfer orders

Being able to auto firm planned transfer orders and not only planned purchase orders.


Filter by warehouse on firming planned orders batch job.

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (324)

STATUS DETAILS
Needs Votes
6

Ability to load external historic transactions to calculate the ADU for DDMRP

When setting up DDMRP with Planning Optimization we have the following challenge:


Currently the average daily usage (ADU) calculation based on past, requires historic transactions (InventTrans) for several days, but by the time we go live this history will not be available.  S...

Read more...

1 Comments

Read more... 1 Comments

Category: Planning (324)

STATUS DETAILS
Needs Votes
29

Simultaneously Runnin of Planning Optimization

The planning optimization is running on another server and there is no control over the actual status of processing between separate runs. We would like to run simultaneously the same Master Plan.

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (324)

STATUS DETAILS
Needs Votes
2

Supply schedule - Product dimension combinations auto-populate

Issue:

On the Supply schedule Modify filter pane, when a Product dimension combination is selected, only the selected dimension is populated. The other relevant dimensions have to be selected manually.


Idea:

Ensure when a Product dimension combination is selected,...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (324)

STATUS DETAILS
Needs Votes
9

Planned transfer is displaying an expiration date based on shelf life and not available On-hand expiration date

When Planned Transfer Orders are generated the system is calculating the batch expiration dates based on the shelf-life days instead of looking at the on-hand expiration date.

Read more...

1 Comments

Read more... 1 Comments

Category: Planning (324)

STATUS DETAILS
New
2

Inter-company Low-level code - Eliminate planning a company twice

There is an "easy-to-miss" system-maintained field on the Released Product named "Low-level code". This has been in most ERP solutions for decades as it dramatically speeds up MRP calculations (NOE: Net-Offset-Explode). It is the lowest level an item appears across Bills of Materials. By proce...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (324)

STATUS DETAILS
Needs Votes
12

Stockable Phantoms and Use-up effectivity

Could we add another BOM line type of Stockable Phantom? Phantom would remain as "always explode" at Estimation, regardless of any Physical on hand or Physical available of the Phantom item. Setting a BOM line as "Stock-able Phantom" would cause MPS to first check for available inventory if th...

Read more...

1 Comments

Read more... 1 Comments

Category: Planning (324)

STATUS DETAILS
Needs Votes
21

Support for lean manufacturing in Planning Optimization

Currently Planning Optimization does not support items that have planned order type of "kanban" which is used in the Lean manufacturing functionality. Any users who have this requirement are blocked from adopting Planning Optimization

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (324)

STATUS DETAILS
Planned
2024 Release Wave 2
3

Global Net Requirements

We recommend to add a new form where we can view the Net requirements for all the Items instead of going Item by Item on the released product.

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (324)

STATUS DETAILS
Needs Votes
4

Reduce Supply Forecast by inbound transactions

Just as it is possible to reduce demand forecasts by outbound transactions ("sales orders" or "all transactions"), it would be great to be able to reduce Supply forecasts by either "purchase orders" or "all transactions" (inventory journals, transfer orders, etc.).



Read more...

1 Comments

Read more... 1 Comments

Category: Planning (324)

STATUS DETAILS
New