1

Extension point after running each planning level in the planning service

Instead of just having one extension point after the complete planning has run, an extension point after the execution of each level would be very useful. This would allow to propagate information all the way down from the top level in the planned order structure to the lowest level, by modify...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (324)

STATUS DETAILS
New
16

Allow additional filtering to inventory transactions selection to create Net requirements within Planning optimization runs

For multiple scenarios in our ISV product, we need the possibility to add additional filtering to inventory transactions selection to create Net requirements (ReqTrans) within Planning optimization runs.

Example:

We need to add a validation by original document's state: e.g. from ...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (324)

STATUS DETAILS
New
7

Parameter for Job resource preemption

In legacy MRP, a line of code was introduced some time long ago related to Property planning. This line of code allowed for one planned order to be split into many small parts during capacity reservations.


Due to a client need to not have one planned order reserve capacity in ...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (324)

STATUS DETAILS
Needs Votes
15

Parameter to remove default filter in Net requirements

When the Net requirements form is launched the transactions are automatically filtered to not include transactions with reference "Safety stock". My client has the need to see the Safety stock transactions, therefore they have to remove the filter every time they launch the Net requirements fo...

Read more...

1 Comments

Read more... 1 Comments

Category: Planning (324)

STATUS DETAILS
New
6

Support Minimum/maximum keys with Planning Optimization

Minimum/maximum keys are no more supported in Planning Optimization according to the documentation.


It's a shame. Could you advice how can we plan an increase/decrease of the safety stock easily now? Do you plan to retrofit this feature in Planning Optimization?


...

Read more...

2 Comments

Read more... 2 Comments

Category: Planning (324)

STATUS DETAILS
New
18

Explosion Form- When using the Transfer delay date button, both the confirmed ship date and the confirmed receipt date should be updated accordingly.

Explosion Form- When using the Transfer delay date button, both the confirmed ship date and the confirmed receipt date should be updated accordingly.

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (324)

STATUS DETAILS
New
4

Planning Optimization filter only on top items to plan whole BOM / Formula structure

In traditional MRP, filtered planning on "top level" items did a full planning including all components. Unfortunately, this is currently not possible in planning optimization. When you want to apply a plan filter, you need to include all components to get an accurate planning result.

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (324)

STATUS DETAILS
Needs Votes
22

Sales line reservation using explosion support for Planning Optimization

When using BOM lines together with Planning optimization the BOM line items are not reserved with Sales orders. The functionality works with the Legacy Master planning which is deprecated. This feature is coming at some point in the future to Planning optimization.


Each possi...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (324)

STATUS DETAILS
New
243

Let the planning optimization engine and the trade agreements processing to consider the unit conversions for the items while genertating the requirements

The planning optimization does not consider item different units; therefore, it does not fetch the correct trade agreement price for the requirements planned orders.

In conclusion, the planning optimization does not respect unit conversion.


For instance, if we have 3 tra...

Read more...

5 Comments

Read more... 5 Comments

Category: Planning (324)

STATUS DETAILS
New
12

DDMRP: Specify spike threshold as a percentage of the red zone

Currently the spike threshold can only be specified as a quantity on the item coverage record. Can this be changed to a percentage of the red zone please as this is the typical way the spike is defined?


Also, can the spike threshold also be moved and or added to the item cove...

Read more...

3 Comments

Read more... 3 Comments

Category: Planning (324)

STATUS DETAILS
New