3

Cross Instance Planning Optimization - Circular Supply Chain

We have a circular supply chain with one fulfillment instance generating demand and manufacturing instance representing supply. Currently Planning Optimization can only be associated with a single F&O instance and does not support circle supply chain between two instances.


F...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (327)

STATUS DETAILS
Needs Votes
4

Aggregate Product SKU Demand Planning

We have a concept of equivalent SKU version based on varying sourcing channels at differing cost. Customer demand is forecasted at an aggregate "planning SKU" across the equivalent SKU/product versions. This is not supported by either Legacy Master Planning or Planning Optimization forcing us ...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (327)

STATUS DETAILS
Needs Votes
1

Dynamics 365 Purchase order terms and conditions policies impact on master planning new changes

Wish there is an option to easily identify, inquiry, report when a potential purchase order terms and conditions may had been changed, cancelled or void (e.g. delivery dates, payments, warranties, insurance, or other), meaning visualizing impact of costing and scheduling on production orders a...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (327)

STATUS DETAILS
Needs Votes
8

Possibility to specify different storage dimension groups to run MRP for tactic and operational master plans

Because the activate the coverage plan by dimension within the storage dimension group, and because the storage dimension group is defined for every single release products, it is not possible to run MRP with different storage dimension group for items between two master plans.


Read more...

0 Comments

Read more... 0 Comments

Category: Planning (327)

STATUS DETAILS
Needs Votes
12

Apply multi-sourcing policies on net requirements level

The new multisourcing functionality allows you to split purchases between multiple vendors on the same item, but it will send the same net requirement all to the same vendor. Some businesses have the requirement to split the next requirements based on the multi-sourcing policies instead of kee...

Read more...

1 Comments

Read more... 1 Comments

Category: Planning (327)

STATUS DETAILS
Needs Votes
9

Gantt chart - Notify when selecting not applicable resource

When showing additional resources to the planned/production orders' Gantt chart, the system indicates which resources are applicable because they meet the requiremets set in the route. Is it possible to add all the resources to the Gantt (applicable and non-applicable) however, when moving an ...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (327)

STATUS DETAILS
Needs Votes
18

Support the same batch selection functionality same time without maintaining minimum stock on the batch level

Issue:


  • The items have been configured to use the Same batch selection functionality hence as a prerequisite configuration the Batch level is marked as Coverage plan by dimension however while updating the Minimum coverage of an ite...

    Read more...

    1 Comments

    Read more... 1 Comments

    Category: Planning (327)

    STATUS DETAILS
    Needs Votes
5

Purchase Order status not considered during MRP Run.

Problem Description: During the MRP run, D365 is considering purchase orders that are in a status of rejected (Approval status) and canceled (purchase order status). Purchase orders that are canceled (Purchase order status) should not be considered ...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (327)

STATUS DETAILS
Needs Votes
1

Demand forecasting: add item name with the forecast dimensions

Make it possible to add item name possible to be shown in the forecast dimensions.  Very difficult to remember what a item number is.

Read more...

1 Comments

Read more... 1 Comments

Category: Planning (327)

STATUS DETAILS
Needs Votes
5

Bundle forecast and consumption

When the signed off forecast of a bundle is published in F&O the items in the BOM of the bundle will publish in the net requirement as a BOM line reference.


Issue is if an actual SO is entered the SO will explode to the component for the SO requirement. This SO line will not ...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (327)

STATUS DETAILS
Needs Votes