2

Planning Optimization Bug-Planned Production Orders are Getting Created Instead of Planned Batch Orders for Formula Items

Many requirements moved from Planned Batch orders (MRP data) to Planned Production orders (PO data) This a bug as some times Formula items requirements is coming as Planned Production Order after running Planning Optimization in D365. However, if you firm those orders then batch orders will be...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (327)

STATUS DETAILS
Declined
5

Negative days and DDMRP coverage groups

New coverage groups have been created recently to manage DDMRP method into D365. Globally these new coverage groups are great and it is nice to have these options. However negative days are not considered by DDMRP model.

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (327)

STATUS DETAILS
Declined
11

Planning Optimization: new feature to handle different minimum lots beetween product orders and trasnfer orders using default order settings

Production flows of our customer consider minimum lots: this could be hard to manage at the current condition because MRP plans transfer orders taking into account the minimum quantity that instead must be considered only for production order. 

Example, if we produce an item A with a min...

Read more...

1 Comments

Read more... 1 Comments

Category: Planning (327)

STATUS DETAILS
Needs Votes
3

Master planning auto firm transfer orders

Being able to auto firm planned transfer orders and not only planned purchase orders.


Filter by warehouse on firming planned orders batch job.

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (327)

STATUS DETAILS
Needs Votes
6

Ability to load external historic transactions to calculate the ADU for DDMRP

When setting up DDMRP with Planning Optimization we have the following challenge:


Currently the average daily usage (ADU) calculation based on past, requires historic transactions (InventTrans) for several days, but by the time we go live this history will not be available.  S...

Read more...

1 Comments

Read more... 1 Comments

Category: Planning (327)

STATUS DETAILS
Needs Votes
29

Simultaneously Runnin of Planning Optimization

The planning optimization is running on another server and there is no control over the actual status of processing between separate runs. We would like to run simultaneously the same Master Plan.

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (327)

STATUS DETAILS
Needs Votes
2

Supply schedule - Product dimension combinations auto-populate

Issue:

On the Supply schedule Modify filter pane, when a Product dimension combination is selected, only the selected dimension is populated. The other relevant dimensions have to be selected manually.


Idea:

Ensure when a Product dimension combination is selected,...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (327)

STATUS DETAILS
Needs Votes
9

Planned transfer is displaying an expiration date based on shelf life and not available On-hand expiration date

When Planned Transfer Orders are generated the system is calculating the batch expiration dates based on the shelf-life days instead of looking at the on-hand expiration date.

Read more...

1 Comments

Read more... 1 Comments

Category: Planning (327)

STATUS DETAILS
New
2

Inter-company Low-level code - Eliminate planning a company twice

There is an "easy-to-miss" system-maintained field on the Released Product named "Low-level code". This has been in most ERP solutions for decades as it dramatically speeds up MRP calculations (NOE: Net-Offset-Explode). It is the lowest level an item appears across Bills of Materials. By proce...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (327)

STATUS DETAILS
Needs Votes
13

Stockable Phantoms and Use-up effectivity

Could we add another BOM line type of Stockable Phantom? Phantom would remain as "always explode" at Estimation, regardless of any Physical on hand or Physical available of the Phantom item. Setting a BOM line as "Stock-able Phantom" would cause MPS to first check for available inventory if th...

Read more...

1 Comments

Read more... 1 Comments

Category: Planning (327)

STATUS DETAILS
Needs Votes