2

Dynamics 365 Supply chain distribution map network route sales order shipment limit mass priority creation

Future featuring the option to mass create priority sales orders and shipment capacity limits as per last map network route maybe optimum luxury. Not featuring the creation of priority sales order per shipment capacity limit as per last map network customer proximity route, user may potentially ...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (327)

STATUS DETAILS
Needs Votes
2

Group by Items at Planned purchase orders in one go

At planned purchase orders user can group by items to sum the quantities of the same item & vendor in one planned purchase order and it helps him to create single line for an individual item in purchase order. User can process this grouping, item wise one by one by selecting the planned purchase...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (327)

STATUS DETAILS
Needs Votes
1

Dynamics 365 Supply chain Forecasts processing Calculation as per vendor/customer Default percentages Applied to inventory on-hand

Future featuring supply chain forecast as per the assigned percentage on master record applied calculation on inventory on-hand maybe optimum practical as per end user selected frequency based period of calculation or calculation range starting today.

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (327)

STATUS DETAILS
Needs Votes
4

Improve calendar working times creation with simple change

When creating calendar working times, the user has to select a working time template. But one can forget this. The result is a worthless calendar where all days are in status "closed", The result then is errors during MRP because MRP cannot generate planned production orders when the planning cal...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (327)

STATUS DETAILS
Needs Votes
9

Periodic Demand forecasts lines should be active for the whole period

Its possible to create demand forecast lines which cover for a period e.g one week or one month. The system will create an inventory forecast for each demandperiod, but the demand is placed on the first day of the period. This gives the result that as soon as the start date of the period is sur p...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (327)

STATUS DETAILS
Needs Votes
3

consolidation of Supply and Demand for the same item with multiple variants

We are expecting master planning should consider the on hand inventory available and open purchase order for the whole product If stock is not available for one variant. Planned orders should be created with this considerations would be great.

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (327)

STATUS DETAILS
Needs Votes
19

Change behavior Parameter "Coverage Plan by Dimension" for tracking dimensions

when switching on the parameter "Coverage Plan by Dimension" on "yes" one of the tracking dimensions the system always will require a value for the dimension. Empty is also considered as a value. The behavior we no see shows that when for example a batch is filled in on the demand (Sales Order) ...

Read more...

1 Comments

Read more... 1 Comments

Category: Planning (327)

STATUS DETAILS
Needs Votes
4

approved planned orders

If I have an approved planned order, MRP is backing off completely . That is good for the dates and the quantities. A big problem is that it also freezesthe BOM> If I get a new active BOM (pretty common with manufacturing revisions), the planned order will NOT see it and when I firm the planned o...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (327)

STATUS DETAILS
Needs Votes
2

Master planning includes on-hand inventory in the calculation even though the field include on hand inventory is not enabled

Customer is using the explosions functionality in Sales order for creating Production order and selected no in the include on-hand inventory on the master planning setup. With the current behavior, the system includes the on-hand inventory after running Master Planning . The expectation is tha...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (327)

STATUS DETAILS
Needs Votes
6

Do not lock item on InventTable when running production order scheduling

Items gets locked on InventTable during production order scheduling (production order created from the item). Items can have changes all the time (e.g. their BOM or route), and their changes do not impact to those production orders that were created before the change. Therefore, locking does no...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (327)

STATUS DETAILS
Needs Votes