Manually updating forecast lines in the "Adjusted demand forecast" menu item is cumbersome and inefficient.

Client forecast over 5000 items on a monthly basis. They process in excess of 125 changes to the generated future forecast before running forecast authorization process. To manually adjust the forecast prior to authorization each record must...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (324)

STATUS DETAILS
Needs Votes

3

Planned consignment replenishment order

VMI items are usually inside IM warehouse, because WMS does not support the feature. When VMI items in IM stock are planned to be discharged via transfer order away form IM to WMS stock due to a demand order, master planning could initiate a planned consignment replenishment order for the IM s...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (324)

STATUS DETAILS
Needs Votes
42

Add Forward facing transactions to Safety stock Calculations

Future demand horizons and demand (including forecasts) should available to be included in safety stock calculations. This feature is available for Kanban calculations and in many/most other Tier 1 ERP planning solutions.

Read more...

2 Comments

Read more... 2 Comments

Category: Planning (324)

STATUS DETAILS
Needs Votes
69

Planning Optimization add-in in French region

Currently planning Optimization Add-in cannot be installed via FR.LCS - There are no other available add-ins for installation. The Planning Optimization is currently available in the following Azure geographies: United States, Canada, Europe, United Kingdom, Austral...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (324)

STATUS DETAILS
Completed
2

Request to document: Continuity Plans and Continuity Scheduling

Regarding - Continuity Plans and Continuity Scheduling in Master Planning Module of D365 Supply Chain Management


There is no documentation available for understanding the function for Continuity Plan and Continuity scheduling in D365 F&O...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (324)

STATUS DETAILS
Needs Votes
10

Prevent blank warehouse in planned orders

Master planning can be set up to plan by site only or by site and warehouse. Most customers plan by site and warehouse.

This means that planned orders are supposed to have warehouses. If not, many cascading problems occur.

MRP is planning for a blank warehouse and demand and suppl...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (324)

STATUS DETAILS
Needs Votes
2

Minimun or maximun Key by date

For example, in some businesses the articles are sold more on Sundays than on Tuesdays or Wednesdays, when the article has a very short useful life such as a salad, it is not possible to use a standard minimum, for example, 20 units are sold from Monday to Friday and Saturday to Sunday 60 units a...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (324)

STATUS DETAILS
Needs Votes
1

Días negativos en la línea de cobertura para Optimización de la planeación

Con la reciente liberación de la optimización de la planeación surgieron algunas brechas con respecto a los días negativos pues la caracteristica no toma en cuenta los días negativos del parametro de dias negativo de las líneas de cobertura cuando se habilita el check de cancelar configuración de...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (324)

STATUS DETAILS
Needs Votes
2

Also include negative stock in Planning Optimization like Master planning

We need to generate purchase- and transfer order advices based on negative stock (products on consignment). Creating an advise from negative stock to zero units was always possible with master planning. Due to the change in the Planning Optimization and request 'Treat negative on hand inventor...

Read more...

0 Comments

Read more... 0 Comments

Category: Planning (324)

STATUS DETAILS
Under Review
1

Master planning should reschedule firmed production orders to keep the info on delay up to date

The master planning does not consider the firmed (existing) production orders for rescheduling and thus information on delay is not up to date. Ideally, it should skip the orders which are locked for rescheduling but reschedule the other open production orders to keep the delivery date up to date.

Read more...