7

Left/Right navigation on new grid control does not perform as expected

Actual Result: Since upgrade to PU53, customer is not able to use left/right arrow to scroll horizontally in the grid on the forms. Also, when the data list is greater than the display window it is shown in, Customer is required to use SHIFT Key Along with Mouse Scroll to scroll horizontally i...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (456)

STATUS DETAILS
Declined
Ideas Administrator

Thank you for reaching out. Your suggestion seems to be a product bug. Please reach out to the relevant support channels.

Sincerely,

Johan Hoffmann

PM, Microsoft

7

Functionality to reverse the Production Order (the one ended by mistake)

There should be an option to reverse the end of Production.

In many cases, due to human error, by mistake the Production Order get ended by the user. In such cases it is lot of work that has to be done again, such as:


  • Create new items for N Raw materials (N items) a...

    Read more...

    0 Comments

    Read more... 0 Comments

    Category: Production Control (456)

    STATUS DETAILS
    Declined
    Ideas Administrator

    Thank you for your feedback. We are not considering the suggestion at this time.

    Sincerely,

    Johan Hoffmann

    PM, Microsoft

7

Production floor execution - Grid overview when reporting the progress of bundled jobs

It would be useful to add the option of reporting the progress of a job bundle from a grid, similarly to what happens when the job bundle is started.

Currently jobs are displayed sequentially: the first job is displayed, and after the quantity in entered you navigate to the next job in t...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (456)

STATUS DETAILS
Completed
Ideas Administrator

This functionality is now supported in version 10.0.40 of the product.

Sincerely,

Johan Hoffmann

PM, Microsoft 

7

Make BOM visible in Production Floor Execution

A great feature to add to the Production Floor Execution would be the possibility to see the BOM of the production order. Just like the instructions button, there should be a BOM button to show all parts used / picked / started on the current production order.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (456)

STATUS DETAILS
Completed
Ideas Administrator

Thank you for your feedback. We released this feature as part of the functionality Register material consumption on the production floor execution interface.

Sincerely,

Johan Hoffmann

Product Manager, Microsoft

7

Allow users to see Materials used for each operation on Job Card Device

Unlike the Job card terminal, users cannot see which/how much materials they have to use/consume on the Job card device. Having the materials defined per operation would be great in the combination with Description/Instruction on the Job card device.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (456)

STATUS DETAILS
Needs Votes
Ideas Administrator

Thank you for your feedback. Currently this is not in our roadmap; however, we are tracking it and if we get more feedback and votes, we may consider it in the future.

 

Sincerely,

Johan Hoffmann

PM, Microsoft

7

Job card device - Add license plate functionality to reporting progress

When reporting progress on a production order using the job card device, you are not able to put the assembled/produced item on a license plate, like the terminal has. When the production output location is license plate controlled, this option should be enabled on the device.

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (456)

STATUS DETAILS
Completed
Ideas Administrator

Thank you for your feedback.

We released this feature as part of the functionality in Dynamics 365 Finance and Operations, Release 10.0.6

Please refer to the following link for more information: 

  https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/report-finished-job-device

 

Sincerely,

PM, Johan Hoffmann

Microsoft.

7

uneven sorting of planned production order line based on requirement dates

When opening the net requirements screen from an planned production order the form does not sort based upon requirement date as designed. When the form is launched for released products the form is sorted properly. Repro steps: go to Production control -> Production orders -> Planned pro...

Read more...

1 Comments

Read more... 1 Comments

Category: Production Control (456)

STATUS DETAILS
Completed
Ideas Administrator

Thank you for your feedback. We have fixed this issue.

  

Sincerely,

Johan Hoffmann

PM, Microsoft

7

Delete the production wave

When working with production orders and advanced warehousing, one creates warehouse work when one releases the production order. But in case of shortage , no materials are available at all, no work is created at all. But the wave is. If I solve my shortage and want to release again, I get an e...

Read more...

2 Comments

Read more... 2 Comments

Category: Production Control (456)

STATUS DETAILS
Declined
Ideas Administrator

Thank you for your feedback. We released this feature as part of the functionality in Dynamics D365.

 

Sincerely,

Johan Hoffmann

PM, Microsoft

7

change parameter "Defer updates of cost calculation until production order reaches ended status"

If I understand the Parameter correct: The parameter prevents the cost calculation until the production order is ended (and there is no way to correct it again). In my opinion, it would be helpful to skip it until the production is reported as finished. In that case you have a chance to make c...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (456)

STATUS DETAILS
Declined
Ideas Administrator

Thank you for your feedback. We are not considering the suggestion at this time due to the following reason: 

This idea has not received enough votes since it was first submitted on: 08-05-2018

Sincerely,

Johan Hoffmann

PM, Microsoft

6

The import of the product route operation properties (using "Engineering change order product route operation properties V2" entity) fails when trying to modify lines with Change type "Unchanged".

Title: 

Enhancement of the “Engineering Change Order Product Route Operation Properties V2” Entity in Dynamics 365


Description:

In Dynamics 365, when importing product route operation properties usin...

Read more...

0 Comments

Read more... 0 Comments

Category: Production Control (456)

STATUS DETAILS
New