Manufacturing capabilities
Hi is manufacturing capabilities planned, or a manufacturing module like nav? this would be excellent
New page action on Planning Worksheet and Req. Worksheet
Add page action to set =true or to set=false Accept Action Message for lines selected or filtered
Add factbox to show stockkeepin...
Increase the number of decimals for "Qty. Per Unit of Measure" field in "Item Unit of Measure"
In Pharma manufacturing, there are several items which are purchased and stored in "KGS". In some BOMs, the same item quantity is defined in Milligrams. So, in such case if, KGS is the base unit of measure, and we need to add an alternate unit of measure in "Item Unit of measure" for "MG", it ...
Standard Cost Worksheet - DISTRIBUTION
Good day
For the standard cost distribution from the Sheet, it is necessary to have all the Certified L.M. and Routes, which is a big problem, because they are not always certified or continue to be developed, and this causes the process to be canceled and you have to readjus...
Time in (ms) in all table (Capacity Need, Capacity Ledger Entries)
Please uniformize time (ms) in all tables
it will be easier to analyze Capacity, Allocated Time, Remaining Time.
These fields not exist and should be added :
Table : 5410 [Prod. Order Capacity Need].[Allocated Time (ms)]
Table 5832 [Capacity LEdger...
System should allow to do subcontracting transaction with Bin code in company location. - Indian localization
This idea is for Indian localization.
System allows to do subcontracting send transaction if we are sending material from Company location which not having bin mandatory.
System doesn't allow to do transaction if we are sending material from location which is bin mandatory.
D...
In error message add the item no. that is causing the error: vendor no. must have a value
During an update in the planning worksheet the system gave the following error message:
Vendor no. must have a value in requisition line: worksheet template name = PLANNING, journal batch name = DEFAULT, Line No. = 20000. It cannot be zero or empty.
Please sho...
Add option in manufacturing setup to split Action message "Reschedule & change qty" in 2 exceptions in planning worksheet
Add option in manufacturing setup to split Action message "Reschedule & change qty" in 2 exceptions in planning worksheet
Current situation:
Sometimes you only want to do 1 only one of the 2, reschedule or change qty. Now you cannot accept the message, because both will ...
Add column "Reschedule days" in planning worksheet. Easier to see which dates are too late or too early.
Add column "Reschedule days" in planning worksheet. Easier to see which dates are too late or too early.
It should calculate the difference between the order original date and the proposed date.
Negative result is the order is too late at the moment.
Positive result the order...
Make the notes from a prod order visible in the planning worksheet and the item availability per event
Make the notes from a prod order visible in the planning worksheet and the item availability per event.
Sometimes you cannot reschedule a prod order for some reason or is the planner waiting for some more information.
It is very helpful if this box is also directly avail...
Administrator